1.0
Objective:
The objective of this Standard
Operating Procedure is to lay down the procedure for
Operation of the Stability Chamber.
2.0
Scope:
This SOP covers operating Procedure
of Stability Chamber.
3.0
Responsibility:
Junior Research Officer, Research Officer: Responsible
for operation of the Stability Chamber as per procedure.
QA Officer/QA
Manager: Review the records and governing the document
4.0 Procedure for Stability Chamber:
4.1 Connect the 15Amp three pin plugs to the
mains supply.
4.2
Ensure that the earthing is
grounded correctly to avoid the sudden shock hazards.
4.3
Ensure that the front door and
inner door is in lock position.
4.4
Switch ON the main and observe that
the mains indicator glows on the front panel.
4.5
Give Water Connection to water
inlet of reservoir pot.
4.6
Now set the required dry
temperature & % R.H as per your requirement.
Provided on control panel having 3
different modes.
5.0 Procedure for
Controller:
5.1 Switch on the cooling system for lower
temperature. A compressor positioning switch is
(1) Off mode: Between the range of 100C.Above
ambient to 600 C & 10% R.H. Above ambient to 95% R.H.
(2) On Mode: Below 100C of
ambient temperature.
(3) Auto mode: Deleted.
6.0
Note: When the water level of water tank will go down to the normal level
the buzzer will
Ring and supply connection to boiler heater will get disconnected.
7.0 Note down the
temperature in the Temperature record in LOG BOOK.
7.0
Calibration Frequency: Yearly
8.0
Routine Maintenance:
8.1 Clean the Stability Chamber every week and
wipe with clean duster.
No comments: