Showing posts with label STANDARD WORKING PROCEDURE. Show all posts
Showing posts with label STANDARD WORKING PROCEDURE. Show all posts

Thursday 14 March 2019

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF MERCURY

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF SODIUM



SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF NICKEL



SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF IRON

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF MANGANESE




PRINCIPLE:
         
The Manganese content of the sample is determined by AAS. For dissolved Manganese, the filtrated sample is directly aspirated to the atomizer. For total recoverable
Manganese an acid digestion procedure is done prior to aspiration of the sample.

Limit of Detection: 0.04 mg/L

REAGENTS:

  1. Hydrochloric Acid – Concentrated
  1. Nitric Acid: Concentrated
  1. Nitric Acid: (1:499)
  1. Manganese Stock Solution: Merck 1000 mg/L NIST Certified Reference Material or Dissolve 1.0 gm of Manganese Metal in 10 ml conc. HCl mixed with 1 ml conc. HNO3 Dilute to 1000 ml with water (1 ml = 1 mg of Mn)

PROCEDURE:

Preparation of Standard solution: Prepare a regent blank and a series of 100 ml standards containing 0.04, 0.08, 0.12, 0.16 and 0.20 mg/L of manganese by diluting a
Suitable volume of the standard solution with dilute nitric acid.

Sample Preparation: To 100 ml portion of the acidified sample add 0.5 ml of nitric acid
If total recoverable Manganese is to be determined, add 5 ml of concentrated HCl and
Filter the sample through acid washed filter paper. Make up to 100 ml in a volumetric flask.

Analysis: Operate the instrument as per SOP. Aspirate nitric acid
(1:499) as blank. Then aspirate series of standards and then aspirate the sample solution.
Read the concentration in mg/L of Manganese directly.



REFRENCE: APHA 22nd Edition 3111 B/ IS 3025 (Part 59) - 2003                     


SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF CALCIUM

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF CHROMIUM

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF ZINC

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF LEAD

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF MAGNESIUM

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF COPPER



SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF CADMIUM

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF ARSENIC

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF SILVER

SOP for STANDARD WORKING PROCEDURE FOR ESTIMATION OF SELENIUM

We have requirement of Production Supervisor In Electrical & Mechanical in Daman

  We have requirement of Production Supervisor In Electrical & Mechanical Working area : daman Exp: 1-2 Years/Fresher Gender:Male Qualif...