Saturday, 17 February 2018

SOP for Operating the Gas Chromatography.


1.0   Objective:
The objective of this operation procedure is to lay down the procedure for Operating the Gas Chromatography.
 2.0      Scope:
This procedure covers operation of Gas Chromatography .
3.0       Responsibility:
            Jr. Research Officer, Research Officer: Responsible for operation and maintenance of
            the instrument as per procedure.
Head of Department: Responsible for maintenance, timely as per   schedule.
QA Officer/QA Manager: Review the records and governing the document.
4.0       Procedure:
4.1       Ensure that the instrument is visibly clean and free from dust.
4.2       Select proper column (Capillary or packed)  for analysis and attached in oven.
4.3       Open the valve of gas cylinder of Nitrogen, Hydrogen and z-Air. And checked the pressure & leakage.
4.4       Open the gas valve of Nitrogen, Hydrogen & Zero air from distribution panel.
4.5       Now switch on the main power supply.
4.6       Switch On the Instrument.
4.7       FID Detector:
4.7.1    Press ‘BUILD/MODIFY’
4.7.2    Press ‘STATUS’ FOR Status of equipment.
4.7.3    Press ‘G.C CONFIGURATION’ & enter all the data for Method (e. g Max Limit of Oven temp, maximum temperature required for injector)
4.7.4    Now Press ‘BUILD/MODIFY’ Active the method by pressing ‘ACTIVE’ switch select
 the required   Method & Press Method (Method 1, Method 2, Method 3, Method 4).         
4.7.5    Inject the sample/ standard and record the chromatogram and print the chromatogram by
            attached printer.                                                                                                                       
5.0       Routine Maintenance:                                                                                         
5.1       Clean the instrument with dry cloth.
5.2       Clean the injector port and replace the septa, glass liner and cotton wool if required        
6.0       Documentation:                                                                                     
6.1       Annexure – 1      Gas chromatography system usage logbook.         XXX/FRM/000
7.0       History of Revision:
Revision No.
Effective Date
Revision Details
Reason for Revision
01
DD/MM/YEAR
Add revision history, routine maintenance and defined responsibility.
Periodic review



Annexure-1
Date
Name Of
Sample
Booking
No.
(A.R. No.)
Batch No.
Analysed By
Remarks








SOP. : XXX/SOP/000-00                                                               Format No. : XXX/FRM/000-00

No comments:

Post a Comment

requirement of Q.C in Daman

  We have requirement of Q.C Working area : Daman/Dalwada Exp: Fresher Gender: Male Qualification: Any Graduated Interested Person Call On t...