Friday, 21 September 2018

SOP FOR PROCEDURE FOR HANDLING AND DESPOSAL OF RETAIN SAMPLE





1.0                  Objective:
              The objective of this standard Operating Procedure is to lay down the procedure for
              Handling and DESPOSAL of Retain Samples.
2.0                  Scope:
              This SOP covers operating procedure for handling and desposal of retain sample
3.0                  Responsibility:
Retain sample-handling personnel
              Responsible for collection, storage and disposal of sample.
QA Officer/QAM: Review the records and governing the document.
4.0                  Procedure:
4.1                Collection and Receipt:
4.1.1        Sample of each booking Number shall be collected from the sample receiving area by who is handling retain sample. 
4.1.2        After collected the sample, enter all the required details of sample in retain sample register. Segregate all the sample by product wise i.e. Raw material, finished product (Tablet, Capsule, Syrup etc.) water and waste water, soil sample and solid waste.
4.1.3        Personnel who receiving the sample will check the appearance of sample, booking number and integrity of packing.
4.1.4        Keep the sample in corrugated box by month wise.
4.1.5        Store the samples at 25°C ± 1°C for 3 months from the date of receipt.
4.1.6        Retain sample shall be checked if complaint from Sponsor.
4.2            Destruction:
4.2.1    The retain samples shall be destroyed after 3 months from the date of receipt.
4.2.2        Destruction of retain sample shall be recorded in the retain sample register.
 4.2.3        Procedure for Destruction:
Strip/Blister of tablet or capsule shall be defoiled and shall be put in disposal container containing water. Foil, Carton shall be cut into pieces then put into the dustbin. Bottle shall be empty in waste disposal container. Label of the same shall be cut into pieces and then put into dustbin and destroy the bottle. Raw material destroys in waste disposal container containing water.  Water sample destroy directly in drainage and waste water, soil sample & solid waste sample destroy in hazardous waste container.       
4.2.4  After destroy the material container shall be send to effluent treatment plant   
at ETP PLANT

No comments:

Post a Comment

requirement of Q.C in Daman

  We have requirement of Q.C Working area : Daman/Dalwada Exp: Fresher Gender: Male Qualification: Any Graduated Interested Person Call On t...