1.0 Objective:
To provide written procedure for
the operation of Muffle furnace.
2.0 Scope:
This SOP covers operation of Muffle
furnace .
3.0 Responsibility:
Jr. Research Officer, Research
Officer: Responsible for operation and maintenance of the instrument as per
procedure.
Head of Department: Responsible
for maintenance, timely as per
schedule.
QA Officer/QA Manager: Review the records and governing the document
4.0 Procedure:
4.1 Ensure that the instrument is clean
and free from dust.
4.2 Switch
‘ ON ’ the mains.
4.3 The green indication light will be ‘
ON ’.
4.4 The required temperature (e.g. 700° C ) can be set by a
thermostatically control knob,
by pushing it.
4.5 After getting required temperature put
the charred sample lying in the silica or platinum crucible (weighed with sample) in
it for the required time and at required temperature.
4.6 Switch off the furnace after the use.
5.0 Routine maintenance:
5.1 Ensure that the power supply to the
instrument is switched OFF before cleaning.
5.2 Clean the instrument with a clean, dry
cloth every day.
6.0 Precaution:
6.1 Do
not keep the door of the instrument open for a long period when the temperature
is ‘ON’.
7.0 History of Revision:
Revision No.
|
Effective
Date
|
Revision
details
|
Reason for
revision
|
No comments: